Board Bill Number 62 In Session 2026-2027
STL Works
Summary
An ordinance recommended by the Board of Public Service authorizing the 2026 St. Louis Works and the 50/50 Sidewalk Programs City Wide providing for the construction and reconstruction of gutters, streets, driveways, spot curbs, sidewalks, alleys, traffic controls, beautification, tree planting, resurfacing and related engineering adjustments listed herein, appropriating $6,000,000.00 from the Street Improvement Fund.
Download
Latest Bill text:
- Introduced (214.89 KB PDF)
Overview
Session: 2026-2027
Introduced: 07/10/2026
Primary Sponsors: Michael Browning
Latest Activity: Register Returns Notice with Ordinance Number
Ordinance: 72176 effective 07/27/2026
Co-Sponsors:
Anne Schweitzer, Matt Devoti, Shameem ClarkHubbard, Rasheen Aldridge, President Megan E Green
Legislative History
Legislative activities and outcomes for this board bill. Learn more about what these activities mean.
-
07/10/2026
First Reading
Bill text was introduced (214.89 KB PDF).
07/10/2026Referred to a Committee
The bill was assigned to the Public Infrastructure and Utilities Committee.
07/15/2026Committee Hearing
The bill was passed out of committee with a recommendation of do pass during the Public Infrastructure and Utilities Committee hearing.
07/20/2026Second Reading
07/20/2026Perfection
The bill was passed.
07/24/2026Engrossment
The bill was engrossed during the Engrossment, Rules, Resolutions and Credentials Committee.
07/24/2026Third Reading
The bill was passed.
07/24/2026Delivered to Mayor
07/27/2026Mayor Returns Bill
The bill was approved.
07/27/2026Help Us Improve This Page
Did you notice an error? Is there information that you expected to find on this page, but didn't? Let us know below, and we'll work on it.
Feedback is anonymous.
5 comments from people like you have helped us improve this page. Keep the feedback coming!
You are leaving the City of St. Louis website
You should be redirected in a few seconds. If this fails, here's the link: