Board Bill Number 62 In Session 2023-2024
Board of Public Service (BPS) Multiple Public Works Projects
Summary
This bill authorizes and directs the City of St. Louis to let contracts and provide for design, right-of-way acquisition, and construction for the Tower Grove Connector, Phase 2 (Sarah Street from Vandeventer Avenue to Forest Park Avenue); Lindell/Union Bridge Reconstruction Over Metrolink and Forest Park Parkway; Traffic Management Enhancements, Phase 5 (Delmar Boulevard from DeBaliviere Avenue to Vandeventer Avenue); and Louisiana Calm Streets, Phase 2 (Meramec Street to Holly Hills Avenue).
Download
Latest Bill text:
- Committee Substitute (769.34 KB PDF)
Overview
Session: 2023-2024
Introduced: 06/09/2023
Primary Sponsors: Anne Schweitzer
Latest Activity: Register Returns Notice with Ordinance Number
Ordinance: 71701 effective 07/12/2023
Co-Sponsors:
President Megan E Green
Legislative History
Legislative activities and outcomes for this board bill. Learn more about what these activities mean.
-
06/09/2023
First Reading
Bill text was introduced (772.45 KB PDF).
06/09/2023Referred to a Committee
The bill was assigned to the Public Infrastructure and Utilities Committee.
06/14/2023Committee Hearing
The bill was passed out of committee with a recommendation of do pass during the Public Infrastructure and Utilities Committee hearing.
The bill text was changed:
- Committee Substitute (769.34 KB PDF)
06/15/2023Second Reading
06/23/2023Perfection
The bill was passed.
06/30/2023Engrossment
The bill was engrossed during the Engrossment, Rules, Resolutions and Credentials Committee.
06/30/2023Third Reading
The bill was passed.
06/30/2023Delivered to Mayor
07/12/2023Mayor Returns Bill
The bill was approved.
07/13/2023Feedback is anonymous.5 comments from people like you have helped us improve this page. Keep the feedback coming!
You are leaving the City of St. Louis website
You should be redirected in a few seconds. If this fails, here's the link: